How a house is built

Every part of a typical Indian house, from the soil up, in the order it is built: what each part is, why it is there, its usual size and what it is made of.

Sizes here are typical, not a design. They show what is common in small Indian homes (ground or G+1, RCC frame, brick walls) so that you can read drawings and talk to builders. The real sizes of footings, columns, beams, slabs and their steel come from a structural engineer who has seen your soil test and loads. Setbacks, heights and coverage come from your local building bylaws.

Most new houses in India are RCC framed: a skeleton of reinforced-concrete footings, columns, beams and slabs carries the weight down to the soil, and brick or block walls simply fill the gaps between the columns. Older and very small houses are often load-bearing: thick walls carry the roof themselves and sit on a continuous strip footing. This page follows the framed house, and points out where load-bearing work differs.

A house cut open from the front gate to the back wall, with its parts numbered 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
  1. Compound wall and gate
  2. Paving and car parking
  3. Sump (underground tank)
  4. Footing on a PCC bed
  5. Neck column
  6. Plinth beam with DPC
  7. Plinth filling and floor
  8. Column (pillar)
  9. Brick wall
  10. Door, under its lintel
  11. Window, lintel and chajja
  12. Roof beam and slab
  13. Terrace waterproofing
  14. Parapet
  15. Overhead tank
  16. Drain and inspection chamber
  17. Septic tank and soak pit
A house cut open from the front gate (left) to the back wall (right). Each part has its own section below.
The parts of an RCC framed house, cut through from the footing to the parapet Roof +3450 Lintel +2550 Sill +1350 Plinth +450 Ground ±0 Founding −1500 Parapet wall Roof slab Roof beam Lintel + sunshade Window Column (pillar) Brick wall (infill) DPC Plinth beam Ground level Neck column Pit, backfilled Footing (RCC pad) PCC bed
The parts of an RCC framed house, cut through one bay. Levels in mm from the natural ground. Load flows down: slab → beam → column → footing → soil.

The order of work

A typical construction timeline for a single-storey house, in weeks Site: weeks 0–1 Foundation: weeks 1–5 Plinth: weeks 5–7 Superstructure: weeks 7–13 Roof slab and curing: weeks 13–17 Services rough-in: weeks 15–19 Plaster and waterproofing: weeks 18–23 Finishes: weeks 22–32 Fittings: weeks 30–33 Outdoor works: weeks 28–33 1 · Site: clear, level, mark out 2 · Foundation: pits, PCC, footings 3 · Plinth: beams, filling, DPC 4 · Superstructure: columns, walls, lintels 5 · Roof: centering, slab, curing 6 · Services rough-in: conduits, pipes 7 · Plaster and waterproofing 8 · Finishes: floors, tiles, doors, paint 9 · Fittings: lights, taps, sanitary 10 · Outdoor: sump, compound wall, paving 0 8 16 24 32 weeks
A typical sequence for a single-storey house of about 1000 sq ft: roughly 8 months. Each extra floor adds about 2–3 months. Bars overlap where crews can work in parallel. Weather, approvals and money flow change this a lot.
  1. Paperwork and soil. Survey, soil test, architect's plan, structural design, building permit.
  2. Site. Clear and level the plot, set up water and power for construction, mark the column and wall positions.
  3. Foundation. Dig pits, lay PCC, cast footings and neck columns, anti-termite treatment, backfill.
  4. Plinth. Plinth beams, plinth filling, DPC. The house now has its floor level.
  5. Ground-floor frame and walls. Columns up to lintel level, brickwork with door and window frames, lintels and sunshades, brickwork up to beam level.
  6. Roof. Centering, beam and slab steel, conduits in the slab, concreting, curing.
  7. Upper floors. Repeat steps 5 and 6, then the staircase headroom, parapet and water-tank platform.
  8. Rough services. Electrical conduits and plumbing pipes cut into walls before plastering.
  9. Plastering and waterproofing. Inside and outside plaster, bathroom and terrace waterproofing.
  10. Finishes. Flooring and wall tiles, door shutters, windows, putty and paint, electrical and sanitary fittings.
  11. Outdoor. Sump, septic tank or sewer connection, compound wall, gates, paving.

1Site and soil

The plot and setbacks

What
The land you build on, and the open margins (setbacks) you must leave between the house and each boundary.
Why
Bylaws require setbacks for light, air, fire access and privacy. They also limit ground coverage (how much of the plot the house may cover) and FAR/FSI (total floor area ÷ plot area).
Typical
Front 3 m (10') or more; sides and rear 1–1.5 m (3'–5') for small plots. Rules differ a lot between cities and panchayats: check yours.

Plots are quoted in feet. A 30' × 65' plot is 9.14 m × 19.81 m = 1950 sq ft (181 m²). A plot is north facing when the road is on its north side, so the main gate and usually the main door face north.

A 30 by 65 foot north-facing plot with its setbacks Road (north side) Buildable area gate 30' = 9.14 m 65' = 19.81 m Front setback ~3 m (10') Side setbacks ~1 m (3') each Rear setback ~1.5 m (5') N
A north-facing 30' × 65' plot. With these example setbacks the footprint is about 24' × 50' (1200 sq ft) per floor.

Soil test

What
A geotechnical investigation: trial pits or boreholes, usually 2–3 for a house, with lab tests of the soil.
Why
It gives the safe bearing capacity (SBC): how much load each square metre of soil can carry, and at what depth. The engineer sizes the footings from it. It also reveals filled-up soil, black cotton (expansive) soil, rock and the water table.
Typical
SBC of 100–200 kN/m² (10–20 t/m²) for ordinary firm soil at 1.5 m depth; black cotton soil and loose fill are much weaker and need special footings.

Site clearing

Remove plants, roots, debris and the loose topsoil (about 150 mm, 6"), fill pits and level the plot. Arrange a construction water source (borewell or tanker plus a temporary sump), a temporary electricity connection, and space to store cement out of the rain, stack bricks and sand, and bend steel.

Marking out

What
Transferring the drawing onto the ground: a centre-line drawing gives the centre of every column and wall from fixed reference lines.
How
Fix a base line parallel to the road, set out right angles with the 3-4-5 rule (3 m, 4 m, 5 m sides) or a total station, check diagonals, and mark pit outlines with lime powder. Strings stretched between profile boards or pegs placed outside the digging area keep the centre lines after the soil is dug away.
Check
Diagonals of every rectangle should match within a few mm. Mistakes here are built into everything after.

2Foundation

The foundation is everything below the floor level: it spreads the weight of the house onto soil that can carry it. In a framed house each column stands on its own footing; in a load-bearing house each wall stands on a continuous strip.

Section through a column footing: pit, PCC bed, RCC pad, neck column and plinth beam Plinth top +450 (1'6") Ground level ±0 Founding level −1500 (5') Footing 1200 (4') PCC 1500 (5') = footing + 150 each side Pit 2100 (7') = PCC + 300 each side Column (pillar) Brick wall DPC, 40–50 mm Plinth beam 230 × 300 (9" × 1') Neck column below plinth Pit, backfilled in 150 mm layers Footing: RCC pad 300 (1') thick, steel mesh PCC bed 100 (4")
An isolated (pad) footing. The pit is dug 300 mm wider than the PCC on every side so masons can work; after the footing and neck are cast, it is backfilled with soil.

Excavation and pits

What
Digging a pit at each column position (or a trench under each load-bearing wall) down to firm soil.
Why
Topsoil is soft and moves with moisture. Going down reaches soil that is stronger and stable.
Typical
1.2–2 m deep (4'–6½'), as set by the soil test; 1.5 m (5') is common. Pit size = PCC size + 300 mm (1') working space each side: for a 1500 mm PCC bed, a 2100 × 2100 mm (7' × 7') pit.
Watch
Level and ram the pit bottom. Shore deep pits in loose soil, pump out water, and never cast a footing on fill or mud.

PCC bed

What
Plain cement concrete (no steel), a thin lean layer at the bottom of the pit.
Why
A clean, level, hard base on which to place the footing steel and its cover blocks; it stops the footing's cement slurry soaking into the soil.
Typical
100 mm (4") thick (75–150), projecting 150 mm (6") beyond the footing on every side. Mix 1:4:8 (M7.5) or 1:3:6 (M10).

Isolated (pad) footings

What
A square or rectangular slab of reinforced concrete under each column. It can be flat or sloped (thicker at the centre).
Why
A column carries tonnes on a small area; the pad spreads that load over enough soil that the soil's bearing capacity is not exceeded.
Typical
1200 × 1200 × 300 mm (4' × 4' × 1') for a G+1 house on firm soil; 900–1800 mm square depending on load and soil. Concrete M20. A mesh of 10–12 mm TMT bars at 150 mm (6") spacing both ways, bent up at the ends, with 50 mm cover.
Steel
Column bars are tied into the footing mesh with an L bend, so the column is continuous from the footing up.

When two columns are so close that their pads would overlap, they share a combined footing. On very weak soil the whole house may sit on a raft (one large slab) or on piles. These are the engineer's call.

Strip footings for load-bearing walls

What
A continuous foundation under a wall: stepped brick or stone masonry on a PCC bed, or an RCC strip.
Why
A load-bearing wall carries load along its whole length, so the foundation must too. Compound walls and some outhouses use them even in framed houses.
Typical
PCC 1:4:8, about 150 mm thick and 2–3 times the wall width; brick footing steps out 57 mm (2¼") each side every 2 courses; 0.9–1.2 m (3'–4') deep. Stone (size-stone or random rubble) is common where it is local.
Section through a stepped brick strip footing under a 230 mm wall Ground 230 mm (9") wall DPC at plinth level Trench, backfilled Brick footing, stepped out 57 mm each side PCC 1:4:8, 150 thick 900 (3')
A strip footing: the wall widens in steps until its load is spread over a wide enough strip of soil.

Column below plinth (neck column)

What
The part of the column from the top of the footing up to the plinth beam; also called the pedestal or stub column.
Why
It carries the column load through the backfilled pit down to the footing.
Typical
The same size and bars as the column above (for example 230 × 300 mm), about 1.2–1.5 m tall. The pit is backfilled around it once the concrete has cured.

Plinth beam

What
An RCC beam linking the columns at plinth level, along every wall line.
Why
It carries the ground-floor walls, ties the columns together so they do not move apart, and resists uneven settlement of the soil. It also makes a level, crack-free base for the walls.
Typical
230 × 300 mm (9" × 1'), top at plinth level, which is 450 mm (1'6") above the ground (300–600 mm; higher on low or flood-prone land). Usually 4 bars of 12 mm with 8 mm stirrups at 150 mm.

In OctBuild the foundation uses these same defaults: a 1200 × 1200 × 300 mm pad on a 100 mm PCC bed projecting 150 mm, founded 1.5 m below ground, in a pit 300 mm wider than the bed each side, and a 230 × 300 mm plinth beam at a 450 mm plinth.

Plinth filling

What
Filling the space inside the plinth beams, up to just below floor level.
Why
It raises the floor above the ground and makes a firm base for the floor; badly compacted fill is the usual cause of sunken, cracked floors.
How
Good soil, murrum or sand in 150–200 mm (6"–8") layers, each watered and rammed or plate-compacted. Then a 75–100 mm (3"–4") PCC bed (1:4:8) on top, and the floor finish on that.

DPC (damp-proof course)

What
A waterproof layer across the full width of every wall at plinth level, on top of the plinth beam.
Why
Brick soaks up ground moisture like a wick. Without a DPC, damp climbs the walls, peels the paint and grows salts.
Typical
40–50 mm (1½"–2") of 1:1.5:3 cement concrete with a waterproofing compound, often finished with a bitumen coat. It must not be broken by the plaster below.

Anti-termite treatment

What
A chemical barrier in the soil around and under the house (as per IS 6313), applied by a licensed pest-control agency.
Why
Termites travel through soil and attack doors, frames, cupboards and wiring. Treating the soil before the floor is laid is far cheaper than treating a finished house.
When
On the bottom and sides of pits and trenches, on the backfill around the foundation, on each layer of plinth filling, and along the outer face of the plinth.

3Superstructure: the frame

Everything above the plinth is the superstructure. Its RCC frame is cast in place: carpenters build formwork (shuttering for sides, centering under slabs), bar-benders tie the steel, the concrete is poured and vibrated, and then it is cured (kept wet) for 7–14 days.

Columns (pillars)

What
Vertical RCC members at wall corners and junctions, rising from the footing to the roof.
Why
They carry the beams and slabs, and everything on them, down to the footings.
Typical
230 × 230 mm (9" × 9") minimum; 230 × 300 or 230 × 450 mm (9" × 12" or 9" × 18") are common for G+1. Usually 3–4.5 m (10'–15') apart. At least 4 bars of 12 mm (often 6 bars of 12–16 mm), with 8 mm ties at 150 mm, 40 mm cover. M20 concrete.
Tip
Make columns as wide as the wall (230 mm) so they hide inside it.

Beams

What
Horizontal RCC members between columns, at each floor and roof level, usually cast together with the slab.
Why
They collect the load of the slab and the walls above, and pass it to the columns.
Typical
230 mm wide; depth roughly span ÷ 12, including the slab: 300–450 mm (12"–18") for 3–4.5 m spans. Bottom and top bars of 12–16 mm, 8 mm stirrups closer near the columns, 25 mm cover.

Slabs (floor and roof)

What
The flat RCC plate that forms the floor of the upper storey or the roof.
Why
It carries people, furniture, water tanks and finishes, and spans between the beams.
Typical
125–150 mm (5"–6") thick for spans up to about 4.5 m. A mesh of 8–10 mm bars at 150–200 mm, 15–20 mm cover. A two-way slab (roughly square panel) carries load in both directions; a one-way slab (long, narrow panel) mostly across the short side.
Watch
Place electrical conduits, fan boxes and plumbing sleeves before pouring. Keep the props in place for 7–14 days or more (longer for longer spans), and cure the slab with ponded water.

Lintels and sunshades (chajjas)

What
A lintel is a small RCC beam over a door or window opening. A sunshade or chajja is a thin slab projecting out from the lintel over a window.
Why
The lintel carries the brickwork above the opening. The chajja keeps rain and summer sun off the window.
Typical
Lintel as wide as the wall, 150 mm (6") deep, resting 150–200 mm on the wall each side, top of opening at 2100 mm (7'). Often all lintels are cast as one continuous lintel band round the house, which also helps resist earthquakes. Chajja 450–600 mm (1'6"–2') projection, 75–100 mm thick, tapering outward.

Staircases

What
An RCC slab (the waist slab) with steps cast on top, rising between floors. Common shapes: straight, L-shaped, and dog-legged (U-shaped, two flights with a landing).
Typical
Riser 150–175 mm (6"–7"), tread 250–300 mm (10"–12"), width at least 900–1000 mm (3'–3'4"). About 18–20 risers for a 3 m (10') floor height. Waist slab 125–150 mm. Clear headroom at least 2100 mm (7'). Handrail about 900 mm (3') high.
Rule
A comfortable step follows 2 × riser + tread ≈ 600–630 mm.
Section through a stair flight showing risers, treads, waist slab and handrail riser 150 tread 275 Handrail ~900 (3') above nosing Landing Waist slab 125–150 thick
One stair flight. Every riser in a flight must be the same height, or people trip.

4Walls

Brick and block masonry

What
Walls built of burnt clay bricks, or of blocks: solid concrete blocks, AAC (light, aerated) blocks, fly-ash bricks, or laterite stone in Kerala and Konkan.
Why
In a framed house the walls enclose rooms, keep out weather and noise, and carry their own weight only; in a load-bearing house they carry the roof too.
Sizes
Traditional brick about 230 × 110 × 75 mm (9" × 4½" × 3"); modular brick 190 × 90 × 90 mm. AAC block 600 × 200 mm face, 100–200 mm thick.
Good work
Soak clay bricks before laying; keep joints about 10 mm and fully filled; break joints between courses (no vertical joint above another); raise no more than about 1 m (3') a day; leave toothing where a wall will continue later; cure for 7 days.

230 mm vs 115 mm walls

Plan of a 230 mm wall of bricks laid across, and a 115 mm wall of bricks laid along 230 mm (9") wall: one brick length thick 230 115 mm (4½") wall: half a brick thick 115
Seen from above. Real 230 mm walls alternate courses of bricks laid across (headers) and along (stretchers), as in English bond, so the wall is tied through its thickness.
WallUsed forMortarNotes
230 mm (9")Outer walls, walls between houses, walls carrying loads1:6Better for heat, security and sound. About 260 mm finished with plaster both sides.
115 mm (4½")Inner partitions between rooms, bathroom walls1:4Needs a reinforcement band or bars every few courses; cannot carry slabs. About 140 mm with plaster.

Mortar

What
A paste of cement, sand and water that beds and bonds the bricks.
Mixes
By volume, cement : sand. 1:6 for 230 mm brickwork, 1:4 for 115 mm walls, 1:4 to 1:6 for plaster. Ready-mixed thin-bed adhesive is used for AAC blocks.
Watch
Mix only what can be used within about 30 minutes; do not re-temper mortar that has started to set.

5Openings: doors, windows, ventilators

A wall elevation with a door, a window and a ventilator, and their levels Ceiling +3000 (10') Lintel +2100 (7') Ventilator sill +1650 Window sill +900 (3') Floor (FFL) ±0 Door 900 × 2100 Window 1200 × 1200 Ventilator 600 × 450 sunshade
Openings line up at lintel level, 2100 mm (7') above the finished floor, so one lintel band can run over all of them. Levels here are from the finished floor.

Doors

Typical
Main door 1050–1200 × 2100 mm (3'6"–4' × 7'); rooms 900 × 2100 mm (3' × 7'); bathrooms 750 × 2100 mm (2'6" × 7'). Sizes are of the opening including the frame.
Shutters
Teak or other hardwood panelled for the main door; flush doors (plywood-faced) for rooms; PVC, WPC or FRP for bathrooms, which do not swell with water.

Windows and ventilators

Windows
1200–1500 mm (4'–5') wide, 1200 mm (4') high, sill 900 mm (3') above the floor. Window area should be at least about one-tenth of the floor area for daylight. Wood, steel, aluminium or uPVC, with glass shutters and usually a steel grill for security.
Ventilators
Small high openings, about 600 × 450 mm (2' × 1'6") with the sill at 1650 mm, for bathrooms, toilets and stores. Often louvred glass, with an exhaust fan opening.

Frames

What
The fixed outer frame (chaukhat) into which the shutters are hung.
When
Fixed while the wall is built: the door frame stands on the floor level before brickwork starts beside it; window frames are set when the wall reaches sill height. Steel holdfasts on the frame are bedded in the brickwork joints.
Materials
Hardwood (teak, sal, honne), steel (pressed sheet), precast concrete, or uPVC/aluminium sections. Treat wooden frames with anti-termite primer on the faces that touch the wall.

6Finishes

Plastering

What
A coat of cement-sand mortar over the brickwork and concrete.
Why
It gives a smooth, true surface for paint, closes gaps and protects the walls from rain.
Typical
Inside walls 12 mm (½"), 1:6. Outside walls 20 mm (¾") in two coats, 1:4, often with a waterproofing additive. Ceilings 6–10 mm, 1:3 or 1:4. Gypsum plaster is a smooth, faster alternative inside.
Watch
Fix chicken mesh where brick meets concrete (these joints crack), finish all conduit and pipe chases first, and cure outside plaster for 7 days.

Flooring and tiling

Flooring
Vitrified tiles (600 × 600 or 800 × 800 mm, 2' × 2' or 2'8" × 2'8") are the most common; granite, marble, Kota stone, Athangudi and red-oxide floors are alternatives. Laid on a cement mortar bed (1:4) or tile adhesive on the PCC sub-floor; 40–50 mm total from the slab or PCC to the finished floor.
Wall tiles
Bathrooms tiled to 2100 mm (7') or full height; kitchens have a dado about 600 mm (2') high above the counter. A skirting strip 100 mm (4") high along the foot of all walls protects them from mops.
Slopes
Bathroom floors slope 1:60 to 1:100 towards the floor trap; balconies slope away from the door.
Layers of a ground floor and of a terrace roof Ground floor Floor tile Mortar bed 1:4 PCC 1:4:8, 75–100 Compacted filling in 150 mm layers Terrace Pressed / terrace tile Brickbat coba, sloped 1:100 Waterproof coat RCC slab 125–150 Ceiling plaster
Floors and roofs are built up in layers; each one has a job. Thicknesses are exaggerated for the thin layers.

Painting

Inside
1–2 coats of wall putty to fill and smooth, a coat of primer, then 2 coats of emulsion (or cheaper distemper).
Outside
Primer and 2 coats of exterior (weather-proof) emulsion; texture paints hide hairline cracks.
Wood and metal
Enamel paint, PU or melamine polish on wood; red-oxide primer and enamel on steel grills and gates.

Waterproofing

Why
Leaks and damp are the most common and most expensive defects in Indian houses. Water gets in at the terrace, bathrooms, sunken slabs, window edges, and wherever pipes pass through.
Terrace
A waterproofing coat or membrane on the slab, then brickbat coba (broken brick in lime or cement mortar) laid to a slope of about 1:100 towards rain-water outlets, finished with tiles. The coating turns up the parapet about 300 mm.
Bathrooms
A waterproofing coat on the floor and 300 mm up the walls (higher in the shower) before tiling, with the floor trap sealed into it. Test by flooding with water for 24–48 hours before tiling.

7Services

Water supply from the sump through a pump to the overhead tank, and drainage out through an inspection chamber to a septic tank Overhead tank Sump Municipal / borewell pump taps inspection chamber Septic tank soak pit
Water comes in to the sump, is pumped up to the overhead tank, and flows down by gravity to the taps. Waste water runs out through inspection chambers to the sewer, or to a septic tank and soak pit where there is no sewer.

Plumbing (water supply)

What
Pipes from the overhead tank to every tap, shower, WC cistern, washing machine and geyser.
Materials
CPVC for hot and cold water inside walls; uPVC or HDPE for outside and the rising main; GI is now rarely used. Typical sizes 15–25 mm (½"–1").
Watch
Pressure-test all concealed pipes before plastering or tiling over them. Note where they run, so nobody drills into them later.

Drainage

What
Pipes carrying used water away: soil pipes from WCs and waste pipes from basins, showers and the kitchen, plus rain-water pipes from the terrace.
Typical
PVC SWR pipes: 110 mm (4") for WCs, 75 mm (3") for waste, 75–110 mm for rain water. Outside, pipes slope 1:40 to 1:60 to inspection chambers (about 450 × 450 mm) at every junction and change of direction. Gully traps and floor traps hold water to keep smells out.

Electrical

What
The meter, a distribution board (DB) with MCBs and an RCCB (earth-leakage breaker), and wiring in PVC conduits to every switch, socket and light.
Typical
Copper wire 1.5 mm² for lights and fans, 2.5 mm² for 6 A/16 A sockets, 4 mm² for ACs and geysers. Switch boards about 1200 mm (4') above the floor. At least one earth pit, two for safety.
When
Conduits for ceiling lights and fans go in the slab before concreting; wall conduits are cut in after brickwork and before plastering. Plan furniture first, so sockets land in the right place.

Septic tank or sewer

Sewer
Where the city has an underground drainage line, the house drain joins it through a final inspection chamber at the boundary (with permission from the local body).
Septic tank
Where there is no sewer: an underground watertight tank, often in two chambers, where solids settle and digest. The liquid goes to a soak pit or drain field. Sized for the number of users (about 1.5 × 1 m and 1.5 m deep for a family of five, as a rough idea); keep it well away from wells and borewells (15 m or more is a common rule) and leave a manhole for cleaning.

Water tank and sump

Need
About 135 litres per person per day for a city home. A family of five uses about 700 litres a day.
Sump
An underground RCC tank storing 1–2 days of water (5,000–10,000 litres), waterproofed inside, with a tight lid, kept away from the septic tank.
Overhead tank
Plastic (HDPE) or RCC, 1,000–2,000 litres, raised on the roof so that taps get pressure. Its weight full (1,000 litres = 1 tonne) must be planned on columns or beams.
Rain water
Many cities make rain-water harvesting compulsory: terrace water is filtered into a recharge pit or stored in the sump.

8Outdoor works

Compound wall

What
The boundary wall round the plot.
Typical
1.5–2 m (5'–6½') high; often lower or with grills at the front. Either 230 mm brickwork throughout, or 230 mm piers about every 3 m (10') with 115 mm panels between, on a strip footing or small pad footings with a plinth beam. A coping on top sheds rain.
Watch
Build it on your own side of the boundary; leave weep holes at the bottom if soil is piled against it.

Gates

Typical
Car gate 3–3.6 m (10'–12') wide in two leaves, or sliding; pedestrian gate 900–1200 mm (3'–4'). Mild steel (MS) fabrication with primer and enamel paint, hung on RCC or steel posts strong enough for the swing.
Watch
Gates should open inward, not over the road.

Car parking

Typical
About 2.5 × 5 m (8' × 16½') per car, more if doors must open beside walls. Many bylaws require one parking space per house; in a north-facing plot it usually sits in the front setback or under a stilt floor.
Floor
100–150 mm of PCC or RCC on compacted soil, or paver blocks; sloped gently to drain.

Paving

What
Hard surfaces for the drive, paths and around the house.
Typical
Interlocking concrete paver blocks 60 mm thick for paths and 80 mm for driveways, on a 50 mm sand bed over compacted soil or murrum. Slope away from the house (about 1:50), with a drain along the edge.
Why
Keeps rain water away from the plinth and the foundations.

Typical sizes at a glance

The sizes below are drawn to scale against each other, so you can compare them by eye. Bylaws and the National Building Code set minimums for some of them; comfortable homes usually go a little above.

Doors and windows

Main, room and bathroom doors drawn to scale next to a person 2100 (7') Main 1050 (3'6") Room 900 (3') Bath 750 (2'6") 1.7 m Windows and a ventilator drawn to scale with their sill and lintel levels lintel 2100 (7') sill 900 (3') 1500 × 1200 living 1200 × 1200 bedroom 900 × 1200 kitchen 600 × 450 ventilator
Doors are all 2100 mm (7') high so their tops line up with the windows' lintels. Sizes in mm, width × height, including the frame.

Room sizes

Living room 12' × 16' · 3.66 × 4.88 m · 192 sq ft
Master bedroom 12' × 14' · 3.66 × 4.27 m · 168 sq ft
Bedroom 10' × 12' · 3.05 × 3.66 m · 120 sq ft
Dining 10' × 10' · 3.05 × 3.05 m · 100 sq ft
Kitchen 8' × 10' · 2.44 × 3.05 m · 80 sq ft
Dog-leg stair 7' × 12' · 2.13 × 3.66 m · 84 sq ft
Car parking 8' × 16' · 2.44 × 4.88 m · 128 sq ft
Bathroom 5' × 8' · 1.52 × 2.44 m · 40 sq ft
Toilet (WC) 4' × 5' · 1.22 × 1.52 m · 20 sq ft
Pooja 5' × 5' · 1.52 × 1.52 m · 25 sq ft
Comfortable sizes for a small Indian home, all drawn to one scale (grid squares are 2' × 2'). Minimums under most bylaws are smaller: about 9.5 m² (100 sq ft) for a habitable room and 1.8 m² for a bathroom.

Stair risers and treads

Comfortable combinations of stair riser and tread riser ≤ 190 tread ≥ 250 2R + T = 600–630 150 × 300 easy 175 × 275 common 190 × 240 too steep 225 250 275 300 325 Tread (going), mm 125 150 175 200 Riser, mm
The shaded band is where steps feel natural: twice the riser plus the tread comes to 600–630 mm. The dashed lines are the National Building Code limits for houses. Any point inside the band and the limits works; keep every step in a flight the same.

9Materials and quantities

The basic materials

Cement
Sold in 50 kg bags. OPC 43 or 53 grade for RCC; PPC (with fly ash) is popular for plaster, masonry and general work. Use within about 3 months, stored off the floor and away from damp.
Sand
Fine aggregate: river sand where it is still allowed, or M-sand (manufactured from crushed rock), with P-sand (finer) for plaster. It must be clean, without clay or salt.
Aggregate
Crushed stone (jelly, khadi, metal): 20 mm for most RCC, 10–12 mm for thin sections, 40 mm for PCC.
Steel
TMT bars, grade Fe500 or Fe500D (Fe550 also used), in 8, 10, 12, 16, 20 and 25 mm diameters, 12 m lengths. Weight per metre = d² ÷ 162 kg (d in mm): 8 mm 0.395, 10 mm 0.617, 12 mm 0.889, 16 mm 1.58 kg/m.
Bricks and blocks
Burnt clay bricks are bought per 1000; AAC and concrete blocks per piece or per m³.
Water
Clean, drinkable water for mixing and curing.

Concrete grades

"M" stands for mix and the number is the strength in N/mm² that a test cube reaches after 28 days. RCC must be at least M20. Nominal mixes are by volume of cement : sand : aggregate. Ready-mix concrete (RMC) and design mixes give better, more consistent concrete for slabs and footings.

GradeMixUseCement per m³Sand per m³Aggregate per m³
M7.51:4:8PCC beds under footings and floors3.4 bags0.47 m³ (17 cft)0.95 m³ (33 cft)
M101:3:6PCC, sub-floors, levelling4.4 bags0.46 m³ (16 cft)0.92 m³ (33 cft)
M151:2:4Non-structural: paving, sills, coping6.3 bags0.44 m³ (16 cft)0.88 m³ (31 cft)
M201:1.5:3RCC: footings, columns, beams, slabs, lintels8.1 bags0.42 m³ (15 cft)0.84 m³ (30 cft)

How these are worked out: dry materials shrink when water is added, so 1 m³ of wet concrete needs about 1.54 m³ of dry material. Split 1.54 by the mix ratio: for M20, cement is 1.54 × 1 ÷ 5.5 = 0.28 m³ = 403 kg (cement weighs 1440 kg/m³) = 8.1 bags.

How quantities are estimated

A proper estimate (a bill of quantities, BOQ) measures every item from the drawings, multiplies by its material per unit, and adds wastage (around 2–5%):

  1. Measure each item in its unit: excavation and concrete in m³ or cft, brickwork in m³, plaster, flooring and paint in m² or sq ft, steel in kg.
  2. Convert to materials with the ratios above: bags of cement, m³ of sand and aggregate, numbers of bricks.
  3. Steel comes from a bar bending schedule (BBS): every bar's length × weight per metre.
  4. Price each material and labour item at current local rates.

Worked example: your house

Here is the foundation and the ground-floor outer walls of a real plan, worked through by hand: a 30' × 65' north-facing plot with a 22'6" × 42' ground floor (6.86 × 12.80 m = 945 sq ft, 87.8 m²) standing on about 20 pillars. Every footing uses the sizes above. Numbers are rounded; swap in the counts and lengths from your own plan.

Step 1 · Excavation

  1. Pit side = footing 1.2 + 2 × 0.15 PCC projection + 2 × 0.3 working space = 2.1 m
  2. One pit = 2.1 × 2.1 × 1.5 deep = 6.62 m³
  3. 20 pits = 6.62 × 20 = 132 m³ (× 35.3 ≈ 4,670 cft)
  4. Most goes back as backfill. Left over per pit = PCC 0.225 + pad 0.432 + neck 0.093 ≈ 0.75 m³, so about 15 m³ to spread on site or cart away.

Step 2 · PCC beds, 1:4:8

  1. One bed = 1.5 × 1.5 × 0.1 = 0.225 m³; 20 beds = 4.5 m³
  2. Dry volume = 4.5 × 1.54 = 6.93 m³
  3. One part = 6.93 ÷ (1 + 4 + 8) = 0.533 m³
  4. Cement = 0.533 × 1440 kg/m³ = 768 kg ÷ 50 = 16 bags
  5. Sand = 4 × 0.533 = 2.13 m³ (75 cft); 40 mm aggregate = 8 × 0.533 = 4.26 m³ (151 cft)

Step 3 · Footing pads, M20 (1:1.5:3)

  1. One pad = 1.2 × 1.2 × 0.3 = 0.432 m³; 20 pads = 8.64 m³
  2. Dry volume = 8.64 × 1.54 = 13.31 m³
  3. One part = 13.31 ÷ (1 + 1.5 + 3) = 2.42 m³
  4. Cement = 2.42 × 1440 = 3,485 kg ÷ 50 = 70 bags
  5. Sand = 1.5 × 2.42 = 3.63 m³ (128 cft); 20 mm aggregate = 3 × 2.42 = 7.26 m³ (256 cft)

Step 4 · Steel in the footings

  1. Bars each way = (1200 − 2 × 50 cover) ÷ 150 spacing + 1 = 8.3 → 9 bars
  2. Bar length = 1.1 m + 2 × 0.1 m bent-up ends = 1.3 m
  3. One footing = 2 directions × 9 × 1.3 m × 0.889 kg/m (12 mm) = 20.8 kg
  4. 20 footings ≈ 416 kg
  5. Thumb-rule check: 8.64 m³ × 50–80 kg per m³ = 430–690 kg. Same ballpark; the engineer's bar bending schedule decides.

Step 5 · Neck columns

  1. Height = footing top (−1.2 m) to plinth beam bottom (+0.15 m) = 1.35 m
  2. One neck = 0.23 × 0.3 × 1.35 = 0.093 m³; 20 necks = 1.86 m³
  3. Cement = 1.86 × 8.1 bags per m³ (M20) = 15 bags; sand 0.78 m³, aggregate 1.56 m³
  4. Steel by thumb rule = 1.86 × 200 kg per m³ ≈ 370 kg

Step 6 · Plinth beam, 230 × 300

  1. Outer walls = 2 × (6.86 + 12.80) = 39.3 m; inner walls about 25 m (measure yours); total 64.3 m
  2. Concrete length between pillars = 64.3 − 20 × 0.3 = 58.3 m
  3. Volume = 58.3 × 0.23 × 0.3 = 4.02 m³
  4. Cement = 4.02 × 8.1 = 33 bags; sand = 4.02 × 0.42 = 1.69 m³; aggregate = 4.02 × 0.84 = 3.38 m³
  5. Steel per metre: 4 × 12 mm bars = 4 × 0.889 = 3.56 kg, plus 8 mm stirrups at 150 (6.7 per metre, ~1.0 m each) = 6.7 × 0.395 = 2.64 kg; with 10% for laps ≈ 6.8 kg/m
  6. Steel = 64.3 m × 6.8 ≈ 437 kg

Step 7 · Bricks in the ground-floor outer walls, 230 mm

  1. One brick with its 10 mm joints = 0.24 × 0.125 × 0.085 = 0.00255 m³, so 1 ÷ 0.00255 = 392 bricks per m³; with 5% breakage ≈ 410
  2. Mortar per m³ = 1 − 392 × (0.23 × 0.115 × 0.075) = 0.22 m³ wet → × 1.33 = 0.295 m³ dry → 1:6 gives cement 0.295 ÷ 7 × 1440 = 61 kg and sand 0.25 m³
  3. Gross wall = 39.3 m long × 0.23 × 2.7 m high (plinth to roof beam) = 24.4 m³
  4. Less openings: main door 2.2 m² + 6 windows 8.6 m² + 3 ventilators 0.8 m² = 11.6 m² × 0.23 = 2.7 m³
  5. Less 14 pillars in the outer walls = 14 × 0.3 × 0.23 × 2.7 = 2.6 m³; less the lintel band = 39.3 × 0.23 × 0.15 = 1.4 m³
  6. Net brickwork = 24.4 − 2.7 − 2.6 − 1.4 = 17.7 m³
  7. Bricks = 17.7 × 410 ≈ 7,300; cement = 17.7 × 61 kg ≈ 22 bags; sand = 17.7 × 0.25 ≈ 4.4 m³ (156 cft)

Totals so far: foundation, plinth and outer ground-floor walls

ItemVolumeCementSandAggregateSteel
Excavation132 m³––––
PCC beds4.5 m³16 bags2.1 m³4.3 m³–
Footing pads8.6 m³70 bags3.6 m³7.3 m³416 kg
Neck columns1.9 m³15 bags0.8 m³1.6 m³370 kg
Plinth beam4.0 m³33 bags1.7 m³3.4 m³437 kg
Outer walls (7,300 bricks)17.7 m³22 bags4.4 m³––
Total156 bags12.6 m³ (445 cft)16.5 m³ (580 cft)≈ 1.2 t

Add 2–5% for wastage when ordering. The roof slab, beams, columns above plinth, inner walls, plaster and flooring are measured the same way: volume × materials per m³.

Whole house: thumb rules per sq ft

For an early budget, builders multiply the built-up area by rough rates for an ordinary RCC-framed house. Use them as a sanity check on a proper estimate, not instead of one.

Cement0.4–0.5 bag / sq ft380–470 bagsfor 945 sq ftG+1 (1,890 sq ft): 760–950 bags
Steel (TMT)3.5–4.5 kg / sq ft3.3–4.3 tfor 945 sq ftG+1 (1,890 sq ft): 6.6–8.5 t
Sand≈ 1.8 cft / sq ft≈ 1,700 cftfor 945 sq ftG+1 (1,890 sq ft): ≈ 3,400 cft
Aggregate≈ 1.35 cft / sq ft≈ 1,280 cftfor 945 sq ftG+1 (1,890 sq ft): ≈ 2,550 cft
Bricks8–10 / sq ft7,600–9,500for 945 sq ftG+1 (1,890 sq ft): 15,000–19,000

Steel per m³ of concrete is another check: roughly 50–80 kg in footings, 80–100 kg in slabs, 100–160 kg in beams and 160–250 kg in columns. A 230 mm wall takes about 400 traditional bricks or 500 modular bricks per m³, and about a quarter of a cubic metre of mortar.

Where the money goes

Rough split of the building cost by part of the house Finishes: about 30% RCC frame: about 25% Masonry and plaster: about 15% Services: about 13% Foundation and plinth: about 12% Outdoor works: about 5% Finishes: floors, tiles, doors, windows, paint RCC frame: columns, beams, slabs, stairs Masonry and plaster Services: electrical, plumbing, sanitary Foundation and plinth Outdoor: compound wall, gate, paving, sump 30% 25% 15% 13% 12% 5%
A rough split for an ordinary specification. It varies widely: premium flooring, woodwork and fittings can push finishes past 40%, and poor soil can double the foundation.

By type of spend, materials are usually about two-thirds of the total and labour about one third, with steel and cement the biggest single materials. Builders quote a rate per sq ft of built-up area; it changes with city, specification and year, so get current local quotes and multiply by your area.

Coming to OctBuild: because the plan already knows every wall, footing, pillar, beam and opening, it can measure these quantities from your drawing instead of a thumb rule.

10Choosing materials

Each material below is listed with its common types, where each is used, its strengths and weaknesses, a rough price level, and how to check its quality on site. Price levels are relative within each table (₹ low, ₹₹ medium, ₹₹₹ high) and vary by region; get local quotes.

Cement

The grey powder that binds sand and aggregate into concrete and mortar. Sold in 50 kg bags; the type is printed on the bag.

TypeUsed forProsConsPrice
OPC 53RCC where early strength matters: slabs, columns, precast workGains strength fast, so formwork can come off soonerMore heat as it sets, so more shrinkage cracks if curing is poor; not ideal for plaster₹₹ Medium
OPC 43General RCC and masonryBalanced strength and workabilitySlower than 53 grade; less resistant to salts than blended cements₹₹ Medium
PPC (fly-ash blended)Foundations, masonry, plaster, and much house RCCLower heat, denser and more durable concrete, smoother plaster, usually cheaperSlower early strength: keep props and curing longer (10–14 days)₹ Low
PSC (slag blended)Coastal sites, sulphate-rich or wet soils, foundations, sumpsBest resistance to chlorides and sulphates; low heatSlow early strength; not stocked everywhere₹ Low

Check on site

  • ISI mark, IS code and the cement type on the bag.
  • Manufacturing date on the bag: use within about 3 months.
  • No lumps; a hand pushed into the bag feels cool and smooth.
  • Store on planks off the floor, away from walls, at most 10 bags high, covered.

Steel (TMT bars)

Thermo-mechanically treated bars that carry the tension in RCC. The number is the yield strength in N/mm²; "D" means extra ductility.

TypeUsed forProsConsPrice
Fe500Standard reinforcement for housesWidely available, well understood by site crewsLess stretch before breaking than the D grade₹₹ Medium
Fe500DHouses in earthquake zones III–V, and any frame where you want a marginBends further before breaking; tighter limits on impuritiesSlightly dearer₹₹ Medium
Fe550 / Fe550DHeavier loads and taller buildingsHigher strength can save some steelOnly if the engineer designed for it; plain Fe550 is less ductile₹₹–₹₹₹ Medium–high
CRS or epoxy-coated TMTCoastal and very damp sitesResists rust much longerCostlier; epoxy coating must not be chipped₹₹₹ High

Check on site

  • BIS mark, brand and grade rolled onto every bar.
  • Bend test: an 8–10 mm bar bent fully back on itself shows no cracks.
  • Weigh a 12 m bar: about 12 × d² ÷ 162 kg (12 mm ≈ 10.7 kg).
  • Light surface rust is fine; flaky, scaling rust is not. Store off the ground and covered.

Sand

Fine aggregate for concrete, mortar and plaster. Its cleanliness decides how strong the mix is.

TypeUsed forProsConsPrice
River sandConcrete, masonry, plasterRounded grains, easy to workMining is banned or restricted in many states; often contains silt, clay or salt₹₹₹ High
M-sand (manufactured)Concrete and masonryConsistent grading, no silt, available everywhereAngular grains need a little more water or admixture; poor batches carry too much dust₹₹ Medium
P-sand (plastering)Plaster onlyFiner and washed: smooth plasterToo fine for concrete₹₹ Medium

Check on site

  • Silt test: shake sand in a jar of salty water and let it settle 3 hours; the silt layer on top should be under about 8% of the sand.
  • Rub a handful between your palms: clean sand does not leave a stain.
  • For M-sand ask for a washed, Zone II grading report.

Aggregate (jelly)

Crushed stone that forms the bulk of concrete. Size is chosen by how thick the member is and how close the bars are.

TypeUsed forProsConsPrice
20 mmMost RCC: footings, columns, beams, slabsStrong, economical mixToo big for thin, crowded sections₹–₹₹ Low–medium
10–12 mmThin slabs, sunshades, precast, crowded steelFlows between barsNeeds more cement for the same strength₹–₹₹ Low–medium
40 mmPCC beds, mass concreteCheapest concrete per m³Not for RCC₹ Low

Check on site

  • Cubical, angular pieces; few flat or long slivers.
  • Clean: no dust or clay coating (wash it if there is).
  • Hard: pieces do not crumble when hit with a hammer.

Bricks and blocks

The units the walls are built from. Weight, size and insulation differ a lot, and lighter walls also lighten the frame and footings.

TypeUsed forProsConsPrice
Red clay brickAny wall; the traditional choiceStrong, good thermal mass, every mason knows itQuality varies kiln to kiln; heavy; uses topsoil₹₹ Medium
Fly-ash brickAny wallUniform size (less plaster), uses waste ashSmooth faces bond less well; needs good curing₹–₹₹ Low–medium
AAC blockWalls in framed buildings, especially upper floorsAbout a third the weight of brick, insulating, quick to layNeeds thin-bed adhesive and care fixing heavy items; must be plastered well outside₹₹ Medium
Solid concrete blockCompound walls, budget houses, ground floorsStrong, fast, cheapHeavy and hot; can shrink and crack₹ Low
Hollow concrete blockPartitions, compound wallsLighter, cheaper, conduits run in the coresLower strength; harder to fix things to₹ Low
Laterite stoneKerala, Konkan, Goa: walls and compound wallsLocal, cool, handsome when exposedHardness varies; porous, so protect from driving rain₹–₹₹ Low–medium

Check on site

  • Clay bricks: even colour, sharp edges, a metallic ring when two are struck together, no cracks.
  • Drop a brick flat from about 1 m onto firm ground: it should not break.
  • Water absorption after 24 h soaking should be under about 20% of dry weight.
  • Blocks: check size, density certificate, and that concrete blocks are at least 28 days old.

Concrete grades

Concrete is chosen by strength and by how harsh its surroundings are (IS 456 "exposure"). Above M20, use a design mix or ready-mix (RMC).

TypeUsed forProsConsPrice
M15PCC under floors, paths, non-structural workCheapNot allowed for RCC₹ Low
M20RCC in houses with mild exposureMinimum grade for RCC; site-mixableToo weak for coastal or wet exposure₹₹ Medium
M25Moderate exposure (humid, coastal away from the sea, wet soil), G+3 and aboveMore durable; less permeableNeeds controlled batching (RMC or weigh batching)₹₹–₹₹₹ Medium–high
M30Severe exposure (sea coast, aggressive soil), taller buildingsHigh durability and strengthRMC, design mix and good supervision₹₹₹ High

Check on site

  • Slump test at the mixer: about 75–100 mm for hand-placed work; no extra water added on site.
  • Cast 3 test cubes per pour and get them tested at 7 and 28 days.
  • Vibrate it well; cure for at least 7 days (10–14 for PPC and PSC).

Roofing

The roof carries rain, heat and often a future floor; choose by climate and by whether you will build up later.

TypeUsed forProsConsPrice
RCC flat slabMost houses; terraces and future floorsStrong, usable terrace, easy to extendAbsorbs heat; needs waterproofing₹₹ Medium
Filler slabSingle and two-storey homesClay pots or tiles replace useless concrete: 15–25% less concrete and steel, coolerNeeds an engineer and skilled crew₹–₹₹ Low–medium
Sloped RCC with tilesHeavy-rain and coastal areasSheds rain fast; traditional lookMore formwork and finishing work₹₹–₹₹₹ Medium–high
Metal sheetsSheds, parking, terrace covers, budget roofsFast, light, cheapHot and noisy in rain unless insulated₹ Low
Mangalore (clay) tiles on a frameTraditional sloped roofsCool, breathable, sheds heavy rainTiles shift and leak; frame needs upkeep₹₹ Medium

Check on site

  • Before a slab pour: steel spacing and cover blocks per drawing, conduits in place, slope set for drainage.
  • Sheets: check thickness (about 0.45–0.5 mm) and coating.
  • Tiles: no cracks, even colour, a clear ring when tapped.

Flooring

Choose by room use: wet areas need grip, high-traffic areas need hardness, and bedrooms can be softer.

TypeUsed forProsConsPrice
Vitrified tileLiving and bedrooms; most of the houseHard, low water absorption, many designs, big sizesSlippery when wet (use matt or anti-skid in wet areas), feels cold₹₹ Medium
Ceramic tileBathroom walls and floors, kitchen dadoCheap, lightSofter, chips, absorbs more water₹ Low
GraniteStairs, kitchen tops, entrancesVery hard and long-lastingHeavy, costly, can be slippery when polished₹₹₹ High
MarbleLiving and puja roomsElegant, coolSoft, stains with acids, needs polishing₹₹₹ High
Kota stoneBudget homes, utility, parking, outdoorsTough, cool, naturally non-slip, cheapLimited colours; needs polishing₹ Low
Wood or laminateBedrooms in premium homesWarm and quietDamaged by water and termites₹₹₹ High

Check on site

  • All boxes for a room from the same batch and shade number.
  • Tap laid tiles: a hollow sound means poor bedding.
  • Joints kept even with spacers (2–3 mm); floors in wet areas fall to the drain.

Doors and windows

Frames and shutters face sun, rain, termites and daily wear; choose by where each opening is.

TypeUsed forProsConsPrice
TeakMain door, framesDurable, stable, resists termites, looks richExpensive; check it is genuine, seasoned teak₹₹₹ High
Sal and other hardwoodsDoor framesHard, strongHeavy; warps or cracks if not seasoned₹₹ Medium
Flush door (IS 2202)Inner room doorsFlat, cheap, easy to laminate or paintSwells if it stays wet₹–₹₹ Low–medium
WPC or PVCBathroom doors and frames, damp areasWaterproof, termite-proofLess strong; can sag if wide₹–₹₹ Low–medium
uPVC windowsMost windowsSeal well, quiet, little upkeepQuality varies by profile; dark colours can warp in heat₹₹ Medium
Aluminium windowsSliding windows, large glassSlim, strong, durableConducts heat; thin sections rattle₹₹ Medium
Steel (pressed or MS)Frames, grills, budget windows, utility doorsCheap, strong, secureRusts unless galvanised and painted, especially near the coast₹ Low

Check on site

  • Wood: seasoned, no wide cracks or loose knots; anti-termite primer on faces touching the wall.
  • Flush doors: ISI mark and a solid core where hinges and locks go.
  • uPVC: profile wall thickness and steel reinforcement inside; aluminium: section thickness about 1.2 mm or more.
  • Stainless-steel or brass hardware, not plated mild steel.

Plaster and paint

Plaster gives the wall its surface; paint protects and colours it.

TypeUsed forProsConsPrice
Cement plasterEverywhere, inside and outDurable, cheapNeeds 7 days of curing; cracks if it dries fast₹ Low
Gypsum plasterInside dry roomsVery smooth, fast, no curingNot for bathrooms or outside walls₹₹ Medium
DistemperBudget interiors, rentalsCheapest paintNot washable; fades₹ Low
Interior emulsionMost interiorsWashable; low-odour optionsPremium ranges cost more₹₹ Medium
Exterior emulsion / elastomericOutside wallsResists rain, sun and fungus; elastomeric bridges hairline cracksCostlier; needs a good primer₹₹–₹₹₹ Medium–high

Check on site

  • Plaster: no hollow sound when tapped; a straight edge shows a flat wall.
  • Let new plaster dry (about 4 weeks) before painting; use putty and primer first.
  • Sealed tins of one batch per wall; note coverage per litre on the tin.

Waterproofing

The cheapest insurance in a house. Pick a system by where the water comes from.

TypeUsed forProsConsPrice
Integral compoundAdded to concrete and plasterCheap, easyOnly reduces absorption; not a barrier on its own₹ Low
Cementitious coating (2-part)Bathrooms, balconies, sumps, tanksBonds to concrete; tiles can go on topRigid: cracks if the slab moves₹₹ Medium
Liquid membrane (acrylic or PU)Terraces, exposed roofsSeamless and flexible; acrylic takes sunPU needs protection from sun; recoat every few years₹₹–₹₹₹ Medium–high
Bitumen membrane (APP/SBS)Terraces, basements, sunken areasTough, provenNeeds a skilled crew to torch-lay and protect₹₹ Medium
Brickbat cobaTerraces, under tilesSlope plus insulationHeavy; not waterproof by itself₹ Low

Check on site

  • Surface cleaned and cracks filled before coating.
  • Coverage per m² as on the product sheet; turn up walls 300 mm.
  • Flood test for 24–48 hours before tiling over.

Plumbing pipes

Supply pipes carry pressure and sometimes heat; drainage pipes carry waste by gravity.

TypeUsed forProsConsPrice
CPVCHot and cold water inside the houseTakes hot water, easy solvent jointsBrittle in cold or sun if left exposed₹₹ Medium
uPVCCold water, outside lines, rising mainCheap, does not rustNot for hot water₹ Low
PPRHot and cold waterHeat-fused joints rarely leakNeeds a fusion tool and trained plumber₹₹ Medium
GI (galvanised iron)Older houses; exposed outdoor runsStrongRusts and scales inside; avoid in walls₹₹ Medium
PVC SWRSoil, waste and rain-water drainageCheap, smoothMust be supported and sloped properly₹ Low

Check on site

  • ISI mark and pressure class (for CPVC, SDR 11) printed on the pipe.
  • Pipes, fittings and solvent cement from the same brand.
  • Pressure-test every concealed line before plastering or tiling.

Electrical wire

Copper house wire, sized by load (see Services). The insulation type decides how it behaves in a fire.

TypeUsed forProsConsPrice
FR PVC copperStandard house wiringFlame-retardant, widely availableGives off dense smoke if it burns₹₹ Medium
FRLS copperHomes, especially multi-storeyLow smoke in a fireSlightly dearer₹₹–₹₹₹ Medium–high
HFFR / ZHFR copperPremium homes, children's and elderly roomsNo toxic halogen fumesMost expensive₹₹₹ High
Aluminium wireAvoid inside housesCheapLoosens at joints and overheats₹ Low

Check on site

  • ISI mark; a full 90 m coil.
  • Cut a sample: check the copper size and strand count against the label.
  • Colour code kept: red/yellow/blue phase, black neutral, green earth.

Choose by the kind of building

Typical choices for common situations. Several can apply at once (a G+2 house on the coast in an earthquake zone): take the stricter choice in each column.

BuildingFoundationStructureWallsRoofFlooringDoors and windowsWhy
1-storey budget houseStepped strip footing in brick or stone, or small pad footings on firm soilLoad-bearing 230 mm walls with RCC lintel and roof bands, or a light RCC frame; M20, Fe500Red clay, fly-ash, laterite or solid concrete blocksRCC or filler slab; sheets for shedsKota, ceramic or budget vitrifiedSal frames, flush doors, steel windowsLowest cost with local materials; one floor does not need a heavy frame.
G+1 / G+2 family house (like yours)Isolated RCC footings 1.2–1.5 m deep on PCC, plinth beamsRCC frame, M20 (M25 if exposure is moderate), Fe500 or Fe500D230 mm brick or fly-ash outside, 115 mm inside; AAC upstairs to save weightRCC slab with terrace waterproofing and a heat-reflective coatVitrified; granite for stairs and kitchen topTeak main door, flush inner doors, WPC bathroom doors, uPVC or aluminium windowsWell-understood, easy to build and easy to extend upward if the footings and columns are designed for it.
G+3 and aboveEngineer-designed: larger, combined or raft footings, or piles, from a soil testRCC frame M25–M30, Fe500D or Fe550D, ready-mix concreteAAC or fly-ash (lighter walls reduce frame and foundation size)RCC slab with a membraneVitrified, granite common areasAluminium or uPVC windows, fire-rated main doors where requiredLoads, wind and earthquake forces grow with height; permits need structural certification; plan for a lift.
Coastal or humid areaFootings in M25+ with 50 mm cover; PSC or PPC cementRCC frame M25, CRS or epoxy-coated TMT, generous coverWell-burnt brick or solid block; 20 mm outside plaster with waterproofing additiveRCC (often sloped) with a membrane; wide overhangsVitrified or Kota; avoid wooduPVC or powder-coated aluminium, stainless-steel hardware, no bare mild steelSalt air rusts steel and damp rots wood; dense concrete and cover protect the bars.
High-rainfall areaPlinth raised 600 mm or more, DPC, drains round the houseRCC frame M20–M25Laterite or brick with water-repellent exterior paintSloped RCC with clay or Mangalore tiles, or a sheet roof over the terrace; eaves and chajjas 600 mm+Anti-skid tiles outside; vitrified insideHardwood or uPVC with drip moulds and deep sunshadesShed water fast and keep walls and foundations dry.
Black-cotton or expansive soilFootings below the active zone (often 2 m+), under-reamed piles, sand or murrum cushion; engineer decidesRCC frame with plinth, lintel and roof bandsLighter AAC or fly-ash blocksRCC slabOn well-compacted murrum fill, never directly on black soilAny; leave small clearances so frames do not jamThe soil swells when wet and shrinks when dry; keep moisture steady with drains and an apron.
Earthquake zone (III–V)Footings tied together with plinth beamsDuctile detailing (IS 13920), Fe500D, M25; regular, symmetric plan; no soft storey or floating columnsLighter blocks; lintel and roof bands; partitions tied to the frameMonolithic RCC slab; no heavy tanks on cantileversAnyKeep openings away from corners and wall endsThe frame must bend without breaking, and a lighter building attracts smaller earthquake forces.
Hot-dry climateStandard footingsRCC frameThick brick, cavity walls, AAC or stabilised earth for insulation and massFiller slab or insulated RCC (brickbat coba, white reflective coat, terrace garden or double roof)Kota or stone: cool underfootSmall west-facing openings, deep shades, jaalis, light-coloured outsideThermal mass and insulation keep the afternoon heat out.
Rental or low-maintenanceStandard footingsRCC frame, M20–M25Fly-ash or clay brickRCC with a good membraneDouble-charge vitrified, granite stairsWPC or uPVC doors, aluminium windows, stainless hardware; washable paintHard-wearing finishes that are cheap and quick to repair between tenants.
Premium homeEngineered footings from a full soil testRCC frame M25+, Fe500D, ready-mix concreteAAC with insulation, or exposed brickInsulated RCC; terrace garden with root-barrier membraneMarble, engineered wood, large-format tilesTeak, double-glazed uPVC or aluminium, quality hardwareComfort and finish matter more, and the budget allows long-life systems.

How to decide

  • Soil. Get the soil test first. Weak, filled or black-cotton soil changes the foundation, and sometimes the walls and floors too.
  • Number of floors. Plan the footings and columns for every floor you might ever add, even if you build one now.
  • Climate. Coast and humidity call for durable concrete and rust-free fittings; heavy rain for sloped roofs and overhangs; heat for insulation and thermal mass.
  • Budget. Spend on what is hard to change later (foundation, frame, waterproofing, wiring, pipes); finishes can be upgraded later.
  • Maintenance. Who will look after the house? Choose finishes that you, or tenants, can keep clean and repair.
  • Local availability. Local materials and skills (laterite in Kerala, Kota in Rajasthan, fly-ash near power plants) are cheaper and better built.
  • Speed of construction. AAC blocks, ready-mix concrete and sheet roofs save weeks; traditional methods save money where labour is cheap.

Glossary of site terms

AAC block
Autoclaved aerated concrete: a light, insulating block for walls.
Backfilling
Refilling dug pits and trenches with soil, in watered and rammed layers.
BBS
Bar bending schedule: a list of every steel bar, its shape, length and weight.
BOQ
Bill of quantities: the itemised list of work and materials used to price a job.
Brickbat coba
Broken bricks in mortar, laid on a terrace to form a slope and insulate.
Built-up area
Floor area including the thickness of walls. Carpet area is the usable floor inside the walls.
Centering and shuttering
Temporary formwork and props (steel plates or plywood) that hold wet concrete in shape.
Chajja (sunshade)
A thin RCC projection over a window to keep off sun and rain.
Coping
The sloped top of a parapet or compound wall that sheds rain water.
Cover
The concrete between the steel and the outside face, which protects steel from rust and fire: 15–50 mm depending on the member.
Cover blocks
Small concrete spacers tied under and beside the steel to keep the cover.
Curing
Keeping new concrete, plaster or brickwork wet for 7–14 days so the cement gains strength.
Dado
Tiling or a finish on the lower part of a wall, as above a kitchen counter.
DPC
Damp-proof course: a waterproof layer at plinth level that stops ground moisture rising in walls.
FAR / FSI
Floor area ratio or floor space index: total floor area of all storeys ÷ plot area, as allowed by bylaws.
FFL
Finished floor level: the top of the finished floor, the zero for heights inside the house.
Footing
The widened base of a column or wall that spreads its load onto the soil.
Founding level
The depth at which the footing rests: the bottom of the PCC bed.
GL / NGL
Ground level / natural ground level of the site.
Ground coverage
The percentage of the plot that the building's footprint may cover.
Lap
The overlap where two bars are joined, usually about 50 times the bar diameter.
Lintel
A small beam over a door or window opening that carries the wall above.
M-sand
Manufactured sand made by crushing rock, used in place of river sand.
M20
A concrete grade: 20 N/mm² strength at 28 days. The minimum for RCC.
Murrum
A gravelly, reddish soil used for plinth filling and sub-bases.
Neck column
The part of a column below plinth level, between the footing and the plinth beam.
Parapet
A low wall round the edge of a terrace or balcony, about 900–1000 mm high.
PCC
Plain cement concrete: concrete without steel, used for beds and sub-floors.
Plinth
The part of the building between ground level and the ground-floor level. Plinth level is its top, typically 450 mm above ground.
Plinth beam
An RCC beam at plinth level that links the columns and carries the ground-floor walls.
RCC
Reinforced cement concrete: concrete with steel bars, strong in both compression and tension.
RMC
Ready-mix concrete, batched in a plant and delivered in a transit mixer.
SBC
Safe bearing capacity: the load per unit area the soil can safely carry.
Setback
The open space required between the building and each plot boundary.
Sill
The bottom edge of a window opening, and its height above the floor.
Skirting
A low tile or stone strip along the bottom of walls.
Soak pit
A pit filled with stones that lets treated waste water seep into the ground.
Stirrups / ties / rings
Loops of thin bar (usually 8 mm) round the main bars of beams and columns.
Sump
An underground water storage tank. OHT is the overhead tank.
TMT
Thermo-mechanically treated steel bars, the standard reinforcement; Fe500 means 500 N/mm² yield strength.
Toothing
Bricks left stepped out at the end of a wall, so that a later wall can bond into it.
Waist slab
The sloping RCC slab of a staircase, under the steps.

This page is a guide for learning, not a specification. Have the structure designed and checked by a qualified structural engineer, follow your local bylaws and the National Building Code, and supervise the work on site.